AOCCC-17 |
Abnormal Operating Conditions – Control Center |
All |
AOCFG-17 |
Abnormal Operating Conditions Field and Gas |
All |
CT0021 |
Measure Soil Resistivity |
Pipeline Corrosion |
CT0031 |
Inspect and Monitor Galvanic Ground Beds/Anodes |
Pipeline Corrosion |
CT0091 |
Troubleshoot and Repair In-Service Cathodic Protection System |
Pipeline Corrosion, Pipeline Electrical & Instrumentation |
CT0121 |
Collect Sample for Internal Corrosion Monitoring |
Pipeline Corrosion |
CT0151 |
Inspect Span and Exposed Piping |
Pipeline Corrosion, Pipeline Maintenance |
CT0441 |
Compressor Startup and Shutdown (Field Operations) |
Pipeline Operations |
CT0451 |
Pump Startup and Shutdown (Field Operations) |
Pipeline Operations |
CT0461 |
Compressor Preventive Maintenance |
Pipeline Maintenance |
CT0461-ISOPU |
Isolate and Purge a Compressor Unit (Field) |
Pipeline Maintenance |
CT0471 |
Inspect, Test, and Maintain Reciprocating Compressor |
Pipeline Maintenance, Pipeline Mechanical |
CT0481 |
Inspect, Test, and Maintain Centrifugal Compressor |
Pipeline Maintenance, Pipeline Mechanical |
CT0491 |
Inspect, Test, and Maintain Rotary Compressor |
Pipeline Maintenance, Pipeline Mechanical |
CT0494 |
Corrosion and Mechanical Damage Measurement with 3D Surface Scanning Device |
Pipeline Corrosion, Pipeline Maintenance |
CT0501 |
Pump Preventive Maintenance |
Pipeline Maintenance |
CT0511 |
Inspect, Test, and Maintain Centrifugal Pump |
Pipeline Maintenance, Pipeline Mechanical |
CT0521 |
Inspect, Test, and Maintain Reciprocating Pump |
Pipeline Maintenance, Pipeline Mechanical |
CT0531 |
Inspect, Test, and Maintain Rotary Pump |
Pipeline Maintenance, Pipeline Mechanical |
CT0541 |
Inspect, Test, and Maintain Screw Pump |
Pipeline Maintenance, Pipeline Mechanical |
CT0591 |
Leak Test at Operating Pressure |
Pipeline Maintenance, Pipeline Operations |
CT0601 |
Perform NDT: Radiographic Testing |
Pipeline Maintenance |
CT0611 |
Perform NDT: Liquid Penetrant Testing |
Pipeline Maintenance |
CT0621 |
Perform NDT: Magnetic Particle Testing |
Pipeline Maintenance |
CT0631 |
Perform NDT: Ultrasonic Testing |
Pipeline Maintenance |
CT0634 |
Perform NDT: Magnetic Flux Leakage on Tank Structures |
Pipeline Corrosion, Pipeline Maintenance |
CT0661 |
Perform API 653 Inspection of Out-of-service Breakout Tanks |
Pipeline Maintenance |
CT0671 |
Join Plastic Pipe: Solvent Cement |
Pipeline Maintenance |
CT0681 |
Join Plastic Pipe: Stab Fittings |
Pipeline Maintenance |
CT0691 |
Joining of Pipe: Nonbottom-Out Compression Couplings (2 inches and under) |
Pipeline Maintenance |
CT0701 |
Joining of Pipe: Bottom-Out Compression Couplings (2 inches and under) |
Pipeline Maintenance |
CT0711 |
Joining of Pipe: Compression Couplings (over 2 inches) |
Pipeline Maintenance |
CT0741 |
Joining of Pipe: Brazing or Soldering |
Pipeline Maintenance |
CT0751 |
Join Plastic Pipe by Butt Heat Fusion: Manual |
Pipeline Maintenance |
CT0761 |
Join Plastic Pipe by Butt Heat Fusion: Hydraulic Machine |
Pipeline Maintenance |
CT0771 |
Join Plastic Pipe: Sidewall Heat Fusion |
Pipeline Maintenance |
CT0771-0781 |
Join Plastic Pipe: Sidewall Electrofusion |
Pipeline Maintenance |
CT0781 |
Join Plastic Pipe: Electrofusion |
Pipeline Maintenance |
CT0791 |
Join Plastic Pipe: Socket Heat Fusion |
Pipeline Maintenance |
CT0861 |
Installation of Steel Pipe in an Open Trench |
Pipeline Maintenance |
CT0871 |
Installation of Steel Pipe in a Bore |
Pipeline Maintenance |
CT0881 |
Installation of Steel Pipe by Plowing/Pull-In |
Pipeline Maintenance |
CT0891 |
Field Bending of Steel Pipe |
Pipeline Maintenance |
CT0901 |
Installation of Plastic Pipe in a Ditch |
Pipeline Maintenance |
CT0911 |
Installation of Plastic Pipe in a Bore |
Pipeline Maintenance |
CT0921 |
Installation of Plastic Pipe Plowing/Pull-In |
Pipeline Maintenance |
CT0931 |
Installation of Plastic Pipe by Plowing/Planting |
Pipeline Maintenance |
CT0941 |
Install Tracer Wire |
Pipeline Maintenance |
CT0951 |
Installation of Pipe Above Ground |
Pipeline Maintenance |
CT0971 |
Install and Maintain Casing Spacers, Vents, and Seals |
Pipeline Maintenance |
CT1011 |
External Coating Application and Repair: Wrapped |
Pipeline Corrosion |
CT1071 |
Repair Steel Pipe by Grinding |
Pipeline Maintenance |
CT1101 |
Tapping a Pipeline with a Self-tapping Tee (Built-in Cutter) |
Pipeline Maintenance |
CT1141 |
Squeeze Off Plastic Pipe |
Pipeline Maintenance, Pipeline Mechanical |
CT1151 |
Squeeze Off Steel Pipe |
Pipeline Maintenance, Pipeline Mechanical |
CT1161 |
Install Customer Meters and Regulators: Residential and Small Commercial |
Pipeline Maintenance, Pipeline Mechanical |
CT1171 |
Install Customer Meters and Regulators: Large Commercial and Industrial |
Pipeline Maintenance, Pipeline Mechanical |
CT1201 |
Temporary Isolation of Service Lines and Service Discontinuance |
Pipeline Maintenance, Pipeline Operations |
CT1231 |
Perform Inside Gas Leak Investigation |
Pipeline Maintenance |
CT1241 |
Perform Outside Gas Leak Investigation |
Pipeline Maintenance |
CT1281 |
Mobile Gas Leakage Survey: Optical Methane |
Pipeline Maintenance |
CT1411-ACCA |
Perform AC Current Attenuation (ACCA or PCM) Survey |
Pipeline Corrosion |
CT1411-ACVG |
Perform Alternating Current Voltage Gradient (ACVG) Survey |
Pipeline Corrosion |
CT1411-DCVG |
Indirect Inspection – Perform Direct Current Voltage Gradient (DCVG) Survey |
Pipeline Corrosion |
CT1631 |
Launching and/or Receiving Internal Devices (Pigs) for Lines Out of Service |
Pipeline Maintenance |
CT1671 |
Inspect and Maintain a Pipeline Heater |
Pipeline Maintenance, Pipeline Mechanical |
CT1681 |
Inspect, Test, and Maintain Liquid Knockout (Dehydration) System |
Pipeline Maintenance, Pipeline Mechanical |
CT1691 |
Inspect, Test, and Maintain Glycol Dehydration System |
Pipeline Maintenance, Pipeline Mechanical |
CT1701 |
Inspect, Test, and Maintain Mole Sieve Dehydration System |
Pipeline Maintenance, Pipeline Mechanical |
CT1_1-17 |
Measure Structure-to-Soil Potentials |
Pipeline Corrosion Control L2 |
CT1_2-17 |
Conduct Close Interval Survey |
Pipeline Corrosion Control L2 |
CT1_3-17 |
Test and Detect Interference |
Pipeline Corrosion Control L2 |
CT1_4-17 |
Inspect and Perform Electrical Test of Bonds |
Pipeline Corrosion Control L2 |
CT1_5-17 |
Inspect and Test Electrical Isolation |
Pipeline Corrosion Control L2 |
CT2_1-17 |
Verify Test Lead Continuity |
Pipeline Corrosion Control L1 |
CT2_2-17 |
Repair Damaged Test Leads |
Pipeline Corrosion Control L1 |
CT2_3-17 |
Install Test Leads by Non-Exothermic Welding Methods |
Pipeline Corrosion Control L1 |
CT2_4-17 |
Install Test Leads by Exothermic Welding Methods |
Pipeline Corrosion Control L1 |
CT3_0-17 |
Obtain a Voltage and Current Output Reading from a Rectifier to Verify Proper Performance |
Pipeline Corrosion Control L1 |
CT4_1-17 |
Troubleshoot Rectifier |
Pipeline Corrosion Control L1 |
CT4_2-17 |
Repair or Replace Defective Rectifier Components |
Pipeline Corrosion Control L1 |
CT4_3-17 |
Adjustment of Rectifier |
Pipeline Corrosion Control L1 |
CT5_1-17 |
Examine for Mechanical Damage on Buried or Submerged Pipe |
Pipeline Corrosion Control L1 |
CT5_2-17 |
Examine for External Corrosion on Buried or Submerged Pipe |
Pipeline Corrosion Control L1 |
CT5_3-17 |
Inspect the Condition of External Coating on Buried or Submerged Pipe |
Pipeline Corrosion Control L1 |
CT7_1-17 |
Visual Inspection of Atmospheric Coatings |
Pipeline Corrosion Control L1 |
CT7_2-17 |
Prepare Surface for Coating Using Hand and Power Tools |
Pipeline Corrosion Control L1 |
CT7_3-17 |
Prepare Surface for Coating by Abrasive Water Blasting |
Pipeline Corrosion Control L1 |
CT7_4-17 |
Prepare Surface for Coating by Abrasive Blasting Media Other Than Water |
Pipeline Corrosion Control L1 |
CT7_5-17 |
Apply Coating Using Hand Application Methods |
Pipeline Corrosion Control L1 |
CT7_6-17 |
Apply Coating Using Spray Application |
Pipeline Corrosion Control L1 |
CT7_7-17 |
Perform Coating Inspection |
Pipeline Corrosion Control L1 |
CT8_1-17 |
Measure Pit Depth with Pit Gauge |
Pipeline Corrosion Control L1 |
CT8_2-17 |
Measure Wall Thickness with Ultrasonic Meter |
Pipeline Corrosion Control L2 |
CT8_3-17 |
Measure Corroded Area |
Pipeline Corrosion Control L2 |
CT9_1-17 |
Install Bonds |
Pipeline Corrosion Control L2 |
CT9_2-17 |
Install Galvanic Anodes |
Pipeline Corrosion Control L2 |
CT9_3-17 |
Install Rectifiers |
Pipeline Corrosion Control L2 |
CT9_4-17 |
Install Impressed Current Groundbeds |
Pipeline Corrosion Control L2 |
CT9_5-17 |
Repair Shorted Casings |
Pipeline Corrosion Control L2 |
CT9_6-17 |
Install Electrical Insulating Device |
Pipeline Corrosion Control L2 |
CT10_1-17 |
Insert and Remove Coupons |
Pipeline Corrosion Control L2 |
CT10_2-17 |
Monitor Probes (Online) |
Pipeline Corrosion Control L2 |
CT11_0-17 |
Monitoring and Controlling the Injection Rate of the Corrosion Inhibitor |
Pipeline Corrosion Control L2 |
CT12_0-17 |
Visually Inspect Internal Pipe Surface |
Pipeline Corrosion Control L1 |
CT14_1-17 |
Locate Line |
Pipeline Maintenance L3 |
CT14_2-17 |
Install, Inspect, and Maintain Permanent Marker |
Pipeline Maintenance L3 |
CT14_5-17 |
Install, Inspect, and Maintain Temporary Marker |
Pipeline Maintenance L3 |
CT15_1-17 |
Visually Inspect Surface Conditions of Right-of-Way |
Pipeline Maintenance L2 |
CT16_1-17 |
Inspect Navigable Waterway Crossing |
Pipeline Maintenance L2 |
CT19_1-17 |
Valve Body Winterization or Corrosion Inhibition |
Pipeline Mechanical L2 |
CT19_2-17 |
Valve Lubrication |
Pipeline Mechanical L2 |
CT19_3-17 |
Valve Seat Sealing |
Pipeline Mechanical L2 |
CT19_4-17 |
Valve Stem Packing Maintenance |
Pipeline Mechanical L2 |
CT19_5-17 |
Adjust Actuator/Operator, Electric |
Pipeline Mechanical L2 |
CT19_6-17 |
Adjust Actuator/Operator, Pneumatic |
Pipeline Mechanical L2 |
CT19_7-17 |
Adjust Actuator/Operator, Hydraulic |
Pipeline Mechanical L2 |
CT20_0-17 |
Inspect Main-Line Valves |
Pipeline Mechanical L3 |
CT21_1-17 |
Repair Valve Actuator/Operator, Pneumatic |
Pipeline Mechanical L3 |
CT21_2-17 |
Disassemble and Reassemble Valves |
Pipeline Mechanical L3 |
CT21_3-17 |
Internal Inspection of Valves and Their Components |
Pipeline Mechanical L3 |
CT21_4-17 |
Repair Valve Actuator/Operator, Hydraulic |
Pipeline Mechanical L3 |
CT21_5-17 |
Repair Valve Actuator/Operator, Electric |
Pipeline Mechanical L3 |
CT22_1-17 |
Inspect Tank Pressure / Vacuum Breakers |
Pipeline Mechanical L3 |
CT22_2-17 |
Inspect, Test, and Calibrate HVL Tank Pressure Relief Valves |
Pipeline Mechanical L3 |
CT23_1-17 |
Maintain and Repair Relief Valves |
Pipeline Mechanical L3 |
CT23_2-17 |
Inspect, Test, and Calibrate Relief Valves |
Pipeline Mechanical L3 |
CT24_1-17 |
Maintain and Repair Pressure Limiting Devices |
Pipeline Mechanical L3 |
CT24_2-17 |
Inspect, Test, and Calibrate Pressure Limiting Devices |
Pipeline Mechanical L3 |
CT25_1-17 |
Inspect, Test, and Calibrate Pressure Switches |
Pipeline Electrical and Instrumentation L2 |
CT25_2-17 |
Inspect, Test, and Calibrate Pressure Transmitters |
Pipeline Electrical and Instrumentation L2 |
CT26_0-17 |
Verify or Set Protection Parameters for Programmable Controllers and/or Other Instrumentation Control Loops |
Pipeline Electrical and Instrumentation L2 |
CT27_1-17 |
Routine Inspection of Breakout Tanks (API 653 Monthly or DOT Annual) |
Pipeline Maintenance L2 |
CT27_2 |
Perform API 653 Inspection of In-service Breakout Tanks |
Pipeline Maintenance L2 |
CT27_3 |
Perform API 510 Inspection of In-service Pressure Vessels |
Pipeline Maintenance L2 |
CT28_0-17 |
Provide Security for Pipeline Facilities |
Pipeline Maintenance L2 |
CT29_1-17 |
Launching In-Line Inspection Devices, Pigs, and Scrapers |
Pipeline Maintenance L3 |
CT29_2-17 |
Receiving In-Line Inspection Devices, Pigs, and Scrapers |
Pipeline Maintenance L3 |
CT30_0-17 |
Test Overfill Protective Devices |
Pipeline Electrical and Instrumentation L2 |
CT31_0-17 |
Inspect and Calibrate Overfill Protective Devices (Liquid) |
Pipeline Electrical and Instrumentation L2 |
CT32_0-17 |
Observation of Excavation Activities |
Pipeline Maintenance L2 |
CT33_1-17 |
Determine Allowable Line Pressure in Section of Pipe to be Moved |
Pipeline Maintenance L3 |
CT33_2-17 |
Preparation for Movement Activities |
Pipeline Maintenance L3 |
CT33_3-17 |
Moving In-Service Pipeline |
Pipeline Maintenance L3 |
CT35 |
Measure Clearance from Existing Pipe to Foreign Structures |
Pipeline Maintenance |
CT34_0-17 |
Inspect Existing Pipe Following Movement |
Pipeline Maintenance L2 |
CT36_1-17 |
Safe Disconnect of Pipeline Facilities |
Pipeline Maintenance L3 |
CT36_2-17 |
Purging of Pipeline Facilities |
Pipeline Maintenance L3 |
CT36_3-17 |
Sealing a Disconnected Portion of Pipeline |
Pipeline Maintenance L3 |
CT37_0-17 |
Install or Repair Support Structures on Existing Aboveground Components |
Pipeline Maintenance L2 |
CT38_1-17 |
Visually Inspect Pipe and Pipe Components Prior to Installation |
Pipeline Maintenance L2 |
CT38_3-17 |
Visually Inspect that Welds Meet DOT Requirements |
Pipeline Maintenance L3 |
CT39_0-17 |
Backfilling a Trench Following Maintenance |
Pipeline Maintenance L2 |
CT40_1-17 |
Fit Full Encirclement Welded Split Sleeve |
Pipeline Maintenance L3 |
CT40_3-17 |
Apply Composite Sleeve |
Pipeline Maintenance L3 |
CT40_4-17 |
Install Mechanical Bolt-On Split Repair Sleeve |
Pipeline Maintenance L3 |
CT40_5-17 |
Install Weldable Compression Coupling |
Pipeline Maintenance L3 |
CT40_6-17 |
Install and Remove Plugging Machine |
Pipeline Maintenance L3 |
CT40_7-17 |
Installing a Tap 2 Inches and Under on a Pipeline System |
Pipeline Maintenance L3 |
CT40_8-17 |
Installing a Tap Larger Than 2 Inches on a Pipeline System |
Pipeline Maintenance L3 |
CT40_9-17 |
Install and Remove Completion Plug on Pipelines Larger than 2 Inches |
Pipeline Maintenance L3 |
CT41_0-17 |
Conduct Pressure Test |
Pipeline Maintenance L3 |
CT42_7-17 |
Welding |
Pipeline Maintenance L3 |
CT44_3-17 |
Inspect, Test, and Maintain Flow Computer for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT44_4-17 |
Inspection, Testing, and Corrective and Preventative Maintenance of Tank Gauging for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT44_5-17 |
Prove Flow Meters for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT44_6-17 |
Maintain Flow Meters for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT44_7-17 |
Inspect, Test, and Maintain Gravitometers/Densitometers for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT44_8-17 |
Inspect, Test, and Maintain Temperature Transmitters for Hazardous Liquid Leak Detection |
Pipeline Electrical and Instrumentation L2 |
CT50_0-17 |
Purge Gas from a Pipeline |
Pipeline Operations L2 |
CT51_0-17 |
Purge Air from a Gas Pipeline |
Pipeline Operations L2 |
CT52_1-17 |
Conduct Vegetation Survey |
Pipeline Maintenance L2 |
CT52_2-17 |
Conduct a Leak Survey with a CGD |
Pipeline Maintenance L2 |
CT52_3-17 |
Conduct a Leak Survey with a Flame Ionization Unit |
Pipeline Maintenance L2 |
CT54_0-17 |
Test Remotely Controlled Shutdown Devices |
Pipeline Operations L2 |
CT55_0-17 |
Maintain Fixed Gas Detection Equipment |
Pipeline Electrical and Instrumentation L2 |
CT56_0-17 |
Perform Incremental Pressure Increases to Uprate the MAOP |
Pipeline Operations L2 |
CT57_0-17 |
Operate Odorant Equipment |
Pipeline Operations L2 |
CT58_0-17 |
Monitor Odorant Level |
Pipeline Operations L2 |
CT59_0-17 |
Vault Maintenance |
Pipeline Maintenance L2 |
CT63_1-17 |
Start-Up of a Liquid Pipeline (Field) |
Pipeline Operations L2 |
CT63_2-17 |
Shutdown of a Liquid Pipeline (Field) |
Pipeline Operations L2 |
CT63_3-17 |
Monitor Pressures, Flows, Communications, and Line Integrity and Maintain Them Within Allowable Limits on a Liquid Pipeline System (Field) |
Pipeline Operations L2 |
CT63_4-17 |
Locally Operate Valves on a Liquid Pipeline System (Field) |
Pipeline Operations L2 |
CT64_1-17 |
Start-Up of a Liquid Pipeline (Control Center) |
Pipeline Operations L2 |
CT64_2-17 |
Shutdown of a Liquid Pipeline (Control Center) |
Pipeline Operations L2 |
CT64_3-17 |
Monitor Pressures, Flows, Communications, and Line Integrity and Maintain Them Within Allowable Limits on a Liquid Pipeline System (Control Center) |
Pipeline Operations L2 |
CT64_4-17 |
Remotely Operate Valves on a Liquid Pipeline System |
Pipeline Operations L2 |
CT65_1-17 |
Start-Up of a Gas Pipeline |
Pipeline Operations L2 |
CT65_2-17 |
Shutdown of a Gas Pipeline |
Pipeline Operations L2 |
CT65_3-17 |
Monitor Pressures, Flows, Communications and Line Integrity and Maintain Them Within Allowable Limits (Gas) |
Pipeline Operations L2 |
CT65_4-17 |
Manually or Remotely Open or Close Valves or Other Equipment |
Pipeline Operations L2 |
CTCC-17 |
Cold Cutting |
Pipeline Maintenance L2 |
CTFB-17 |
Flange Bolting |
Pipeline Maintenance L2 |
CTMP-17 |
Mud Plugging |
Pipeline Maintenance L2 |
CTTB-17 |
Tubing |
Pipeline Maintenance L2 |
CTTP-17 |
Threaded Pipe Fabrication |
Pipeline Maintenance L2 |
CTAIR |
Operate Air Movers |
Pipeline Maintenance L2 |
CTBUFF |
Repair Steel Pipe by Buffing |
Pipeline Maintenance |
CTCASE-INSTL |
Installation of Underground Casing |
Pipeline Maintenance |
CTCLOSE |
Operate and Maintain Closure Devices |
Pipeline Maintenance |
CTFBHOT |
Perform Hot Bolting |
Pipeline Maintenance |
CTFP |
Freeze Plugs |
Pipeline Maintenance |
CTHYDTANK |
Hydrostatic/Pneumatic Testing a Breakout Tank |
Pipeline Maintenance |
CTHYDVAC |
Hydrovac Operations |
Pipeline Maintenance |
CTMTRLV |
Material Verification |
Pipeline Maintenance |
CTRC |
Removal of Casing (Hot or Cold Cut) |
Pipeline Maintenance |
CTRMLD |
Conduct a Leak Survey Using a Remote Methane Leak Detector |
Pipeline Maintenance |
CTTANK |
Tank Repair |
Pipeline Maintenance |
CTVENT |
Venting and Cleaning Tanks |
Pipeline Maintenance |